Agile Project Management Processes–Process 5.1 Organizational Practices


The Agile Project Management Processes Grid has been created by John Stenbeck in his book “PMI-ACP and Certified Scrum Professional Exam Prep and Desk Reference.”   He divides the 87 processes used in agile project management into five process groups and seven knowledge areas.

This post covers the first of three processes in the block of processes that are used in the Initiate process group and the Risk Management knowledge area:  Organizational Practices.

A Failure of Imagination

The NASA program that eventually took three Americans to the moon in 1969 had a very disastrous beginning.   Apollo 1 was designed to take the Saturn rocket that would eventually take men to the moon and to test it out in Earth orbit.   The three astronauts, Gus Grissom, Edward White, and Roger Chaffee, were doing a routine test on the launch pad on January 27th, 1967, when a fire broke out in the cockpit which killed all three of them.

There was an investigation which showed that the origin of the fire was a spark that came from a faulty electrical connection, which was exacerbated by the highly oxygenated environment in the cockpit of the Command Module.    However, the chairman of the Congressional Committee that investigated the incident asked a fellow astronaut Frank Borman, “what do you think caused the fire?   I’m not talking about wires or oxygen here==what do you think was the underlying cause of the fire?

Frank Borman answered that it was a failure of imagination.   In doing risk analysis on the Apollo program, NASA put their focus almost entirely on the dangers to the astronauts due to the hazardous vacuum conditions that exist in outer space.   NASA didn’t, however, consider the risks to the astronauts that could be caused on a routine training exercise that took place on the ground.   That was the reason for the fire.

Brainstorming

Risk analysis can be divided  into two categories:

  1. Generic risks–these are risks that are common to all projects that are particular to the organization itself
  2. Unique risks–these are risks that are particular to the project itself

The first approach to risk analysis in both categories is brainstorming, where the team member and the customer/proxy get together and create a list of possible catastrophic events that could impact the project negatively.

There are way of doing this which add an element of fun, which counteracts the negative nature of the content.   Try giving awards for those that come up with various nightmare scenarios such as

  • “Academy Award for Best Screen Play” goes to the person who describes the negative scenario in the most dramatic fashion.
  • “Pulirzer Prize in Investigative Reporting” that describes the negative scenario in the most matter-of-fact way as if it was the subject of a 60 Minutes investigative report.

These are just examples, but you get the idea.   You want to encourage people’s imagination and creativity.

Risk Analysis

The next step after coming up with the negative scenarios in the brainstorming session is to analyze them and, in each case, come up with the root cause of the scenario.  You can group the root causes of the risks in something called a Risk Breakdown Structure that categorizes the various sources of the risks.

Prioritizing Risks

The next step in risk analysis after you’ve analyzed the root causes is to prioritize risks using the following process.

  1. Estimate on a rough numerical scale (1 to 10) the probability of the risk occurring
  2. Estimate on a rough numerical scale (1 to 10) the impact of the risk occurring
  3. Create a risk matrix that shows the probability of a risk occurring and its impact if it does occur, and graph the estimates done in the first two steps.
  4. Decide which sectors of the matrix correspond to a HIGH, MEDIUM, and LOW level of risk.   Usually the lower-left corner is LOW, the upper-right corner is HIGH, and MEDIUM is somewhere in an area in between these two other areas.

This basic risk profile will be expanded upon and detailed in the planning process group.

Some of the risks are going to come not from the organization, but from outside the organization; in particular, from government regulations.  The next process 5.2 Regulatory Discovery deals with risks that come from this source.

 

How to RISE to the Occasion of Being a Leader


Yesterday at the Winter 2015 installment of the Toastmasters Leadership Institute (TLI) here in Chicagoland District 30 of Toastmasters International, Mark Brown, the 1995 World Champion of Public Speaking, was the keynote speaker.

In yesterday’s post, “ATE Ways Leaders Get Things Done”, Mark Brown outlined 8 traits that leaders should possess who want to empower their team, as opposed to aggrandizing power to themselves and thereby undermining their team, as poor leaders do.    This was based on Mark Brown’s second presentation at the Winter TLI that was done mid-morning.

After lunch, Mark Brown gave his final keynote presentation of the day.   Ethel Goatee, our District Director, coined a phrase RISE, which stands for Respect-Integrity-Service-Excellence, at the beginning of our current Toastmaster year which runs from July 2015 until next June.   These were the 4 characteristics she felt that leaders should possess, whether in Toastmasters, at the workplace, or in another non-profit or community organization.    Mark Brown took this acronym, and spoke for about 45 minutes about what each of these 4 characteristics meant to him.   That was the basis of his presentation, which I summarize below.

RESPECT

You need to respect your team members, of course, but you can’t respect others until you respect yourself.    Restoring work-life balance is simply a matter of restoring respect for the integrity of your body, mind, and spirit.    Stephen Covey, in his work “The 7 Habits of Highly Effective People” talks about P-PC balance, meaning “production” and “production capacity.”   Production is the capital that you expend to get things done.   Production capacity is what you do to build up that capital.    Near-sighted managers will ask their team members to always be in the “P” or “production” cycle, but leaders will have the wisdom to encourage their team members to take time out for building up “production capacity”–by resting, or studying and thereby sharpening one’s skills.   A leader HAS to start with him or herself, however, in this endeavor.

INTEGRITY

There are three key questions people will ask about you to determine whether you have integrity.

  • Can I trust you?   Whatever happened to the concept of the “gentleman’s agreement”, where a handshake and a verbal commitment were considered enough?
  • Can I depend on you?    If I give you a task, do I have to spend time and energy following up or can I relax knowing that you will either accomplish it or tell me quickly if you cannot?
  • Can I defend you?   If your integrity is challenged, can I give evidence of your character based on examples of your past conduct?

SERVICE

Service is not, as is sometimes supposed, what you do for others, but it is who you choose to be at each moment of your life.   My mother had a saying, “work is love made visible.”  If you truly love the people that surround you, work or sacrifice is not sacrifice of yourself as much as it is an expression of gratitude towards others.   You do not do it for the promise of a reward.

There’s a saying I have that there are three stages of being a Toastmaster.  The first is when you are afraid to get on stage.   That’s the reason why people join Toastmasters in the first place, to get rid of their stage fright.  And then, the benefits of mastering public speaking start to accrue–people applaud when you do a speech!   How gratifying is that?

Well, that takes you to the second stage–when you are afraid to get off stage.   You are enjoying the limelight, and like the proverbial Jack Horner of the Mother Goose rhyme, you say to yourself “What a good boy [or girl] am I!”

There are some people who are stuck at this stage, blissfully unaware that there is a third stage of being a Toastmaster, when you know the right time to get on stage and the right time to get off stage.   In other words, you know that the message that you are giving is ultimately more important than the messenger.  This is when your passion for service takes over and your speaking is in service of the audience and not in service of your own ego.   That is the stage that all Toastmasters should strive for.

EXCELLENCE

Your worst enemy can be the word “good”, if it is said in the context of meaning “good enough”.   You’ve heard of the phrase “good enough for government work”?    It implies that you are setting the standard too low.   Unfortunately, that’s what many of us do.   Because we want perfection that we feel cannot be achieved, we use that as an excuse to attempting to go farther, to do better–in short, to achieve excellence.

If you do achieve something, then celebrate!   But turn that period of celebration into a comma, not a period.   In other words, don’t rest on your, uh, laurels, but rather ask yourself:   is there more than I can do?   Is there more of my experience that I can share with my team?   Can I make a difference for my team by making a decision–or by letting them make a decision?

It is a privilege of a lifetime to be who you are.   But with that privilege comes a responsibility to help others be all that they can be.   If you exemplify this culture of excellence in your own life, people will be attracted to it because they will want to experience in their own lives.

Thus, the acronym of RISE–Respect, Integrity, Service, and Excellence–can truly be the touchstone of your future potential as a leader!!

 

“ATE” Ways Leaders Get Things Done


At the Winter 2015 version of the Toastmasters Leadership Institute held in District 30 Chicagoland at AT&T University today, I was present at the opening presentation by the keynote speaker Mark Brown, He gave a brief biographical sketch of how he came to the United States as an immigrant from Jamaica with $40 in his pocket and a dream of a better life.

After joining Toastmasters in 1994, he entered a speech contest and got all the way to the finals on his first try.   He engaged the 1990 World Champion of Public Speaking David Brooks to coach him for the next year’s competition, and he ended up becoming the 1995 World Champion of Public Speaking!

In the second presentation he made later on that morning, he talked about the other set of skills that Toastmasters is known for other than speaking skills, namely leadership skills.    He shared eight ways in which leaders get things wrong, and eight ways in which leaders get things right.   In both cases, the eight ways all end in the letters “A-T-E”, and that is the reason for the title of his talk which is the same title as this blog post.

Let’s start with the bad examples before we get to the good ones.

Eight Ways Leaders Get Things Wrong

  1. Manipulate—they use team members for personal gain, such as taking credit for achievements that in reality were only made possible by the members of the team
  2. Dominate—they play the tyrant and get things done by virtue of their authority alone, at the expense of eroding the relationship of trust between the leader and the members of the team
  3. Intimidate—they browbeat and discourage team members, by micromanaging them or undermining their confidence
  4. Vacillate—decisions are made rashly and sometimes reversed for no apparent reason
  5. Frustrate—subordinates are impeded when they bring up ideas for change
  6. Incapacitate—team members are hindered from doing their jobs
  7. Denigrate—they put down or belittle team membdrs
  8. Procrastinate—they put off making decisions until they hit a crisis point

Everyone in the audience was probably making a little checklist of which of their current or previous bosses fit one of these eight toxic leadership styles.    The important thing, however, is not to take the resentment you might feel in these situations if you are on the receiving end and take it out on others.

Rather, you need to break the chain and resolve not to treat team members this way when Everyone in the audience was probably making a little checklist of which of their current or previous bosses fit one of these eight toxic leadership styles.    The important thing, however, is not to take the resentment you might feel in these situations if you are on the receiving end and take it out on others.Rather, you need to break the chain and resolve not to treat team members this way when you are the leader.

Eight Ways Leaders Get Things Right

  1. Communicate
  • Clearly define tasks and responsibilities—state dates and times for deadlines
  • Explain procedures in detail
  1. Educate
  • Share your knowledge by having a clear succession plan
  • Help your team members to succeed by giving them the gift of your experience
  • It doesn’t matter who gets the prize if the team wins
  1. Delegate
  • Show people you are not alone
  • Allow subordinates to grow
  • Make sure team gets credit for successes
  1. Participate
  • Get involved, but not OVERLY involved to the point of micromanagement—be a PART, not a PEST
  • The right balance depends on the team member you are dealing with
  • Stay aware and stay “in the loop”
  1. Relate
  • Build relationships—see the person, not the role or title
  • Be approachable
  • Show understanding of the person and their circumstances
  1. Motivate
  • Tune them into WIIFM (What’s In It For Me)
  • Build confidence in your leadership by showing confidence
  • Remind them of their WHY (i.e., their passion)
  1. Appreciate
  • Be the cheerleader and team builder
  • Mark milestones with ceremony
  • Celebrate team successes and individual accomplishments
  1. Dedicate
  • See your responsibility first, not your privilege
  • Know the risks, but forge ahead anyway
  • Don’t be a manager, be a leader!

This is the bare outline of his presentation, which included examples of most of the points he was making.   It contained so many specifics about being a memorable leader that I wanted to share it with everyone!

Agile Project Management Processes Grid: Initiate Process Group & Risk Management Knowledge Area


In John Stenbeck’s book “PMI-ACP and Certified Scrum Professional Exam Prep and Desk Reference”, he creates an Agile Project Management Process Grid containing 87 processes divided into 5 Process Groups and 7 knowledge areas.

Here are the five process groups in Traditional and Agile PM.

TRADITIONAL Initiating Planning Executing Monitoring &
Controlling
Closing
AGILE Initiate Plan Iterate Control Close

Notice how the Initiating, Planning, and Closing are the same between the three (using the normal verb form in Agile rather than gerund or noun form used in Traditional).   Monitoring & Controlling is shortened to Control, and then Executing is replaced by Iterate.    In reality traditional PM also goes back and forth between Executing (doing the project work) and Monitoring & Controlling (checking the project work), but this “back and forth” pattern is emphasized in Agile with the word “Iterate”.   So far so good; these two sets of process groups correlate pretty clearly.    Now let’s go on to the knowledge areas.

TRADITIONAL AGILE
Integration External Stakeholders Engagement
Scope Value-Driven Delivery
Time Adaptive Planning
Cost Team Performance
Quality Risk Management
Human Resources Communication
Communications Continuous Improvement
Risk
Procurements
Stakeholders

Note that this is just the order that the knowledge areas are listed in.    There are 10 knowledge areas for Traditional PM, and 7 knowledge areas for Agile.     How do these knowledge areas correlate?     Well, here’s my best attempt to put those knowledge areas in Traditional PM next to their Agile counterparts.

TRADITIONAL AGILE
Integration (various knowledge areas)
Scope Value-Driven Delivery
Time Adaptive Planning
Cost Adaptive Planning
Quality Value-Driven Delivery,

Continuous Improvement

Human Resources Team Performance
Communications Communication
Risk Risk Management
Procurements N/A
Stakeholders External Stakeholders Engagement

The Risk Management area in Agile PM covers the same ground as in Traditional PM.

Here are the three processes in agile Risk Management that fall under the Initiate Process Group:

  • Process 5.1–Organizational Practices
  • Process 5.2–Regulatory Discovery
  • Process 5.3–Quality Standards

Why are these in the Initiate Process Group?   Because they are risk factors that exist prior to the existence of the project.    In traditional PM, the inputs to risk management that come from inside or outside the organization regardless of the contents of the project are referred to as Enterprise Environmental Factors.   They are environmental factors because they come from practices and standards that exist in the environment in which the project takes place.    They are enterprise factors because they are not peculiar to the project itself, but exist at the level of the enterprise.

The next three posts will cover these three processes to show how Risk Management can be started even before the start of planning for an agile project.

 

The Gratitude Journal Advantage


Back in May 2011, Shawn Achor, a psychologist who is the CEO of Good Think, Inc., gave a talk about positive psychology at a TED talk  in May 2011.   I outline his talk below which he concludes with a methodology on how to press the “reset” button for your mindset so that you are more optimistic.    One of the methods includes writing three things you are grateful for, so I thought it would be appropriate to repost this on Thanksgiving Day.   I have some additional information on how not just psychology, but neuroscience also proves that gratitude gives you a positive mental advantage.

1. Escaping the law of the average

Social scientists make pronouncements about trends based on averages within populations, but people have to realize that when you are dealing with the potential for individual happiness or creativity, you need to escape the “law of the average”. When psychologists strive to make people “normal”, then if they succeed, people will continue to remain merely average.

I can illustrate Shawn Achor’s point with a story.  A friend of mine who was taking economics in graduate school, and I saw him one day in a coffee shop looking a little glum. “What’s wrong?” I asked him. “Oh, it sounds silly, but I’m a little bummed. My statistics professor said that up to 50% of us in the class would end up doing below average on the test.”

Intellectually, he knew that this was of course true because it hinges on the technical definition of the word “average”. However, it was the implication that he had only a 1 out of 2 chance of escaping mediocrity that was a challenge to his self-esteem.

2. Studying outliers

Shawn Achor has studied those individuals who have higher than average potential to find out what their secret is in order to be see if some of those secrets can be passed on to the rest.  Instead of a psychology model that tries to drag everybody down towards being average by making them “normal”, he wants to have a positive psychology model that moves everyone’s average up.

3. Changing the lens

We view the world through the lens of the media, which selectively captures negative events and brings them to our attention, with the news hour occasionally ending in a positive story. This has an effect on us where we start to assume a false picture of the world where that same ratio of negative events to positive events is replicated throughout the world.

4. External circumstance does not determine inner attitude

Shawn Achor related how the students he counseled at Harvard University should have been happy to be at such an elite school, but they sought counseling because they concentrated on the negatives of the workload, peer pressure, etc. He realized that no matter how good the outer circumstances, there were some people who have a negative attitude internally. He found that the external circumstances only account for 10% of a person’s happiness over the long term; the other 90% are determined by the way in which that person views the world.

In the work environment, he found that only 25% of job successes are predicted by a person’s intelligence level. The other 75% are accounted for by your optimism levels, your social support levels, and your ability to see stress as a challenge rather than as a threat.

5. How can you change your mindset?   A gratitude journal!
Here’s the kernel of what Shawn Achor came to talk about. Most schools and workplaces have the mindset “if you work hard, you will be successful. If you are successful, then you will be happier.”  This theory of motivation is backwards.  If you have a success, then the workplace or school simply changes the goalposts and you have to achieve even better success the next time. If happiness is thought to be on the other side of success, your brain never gets there, it pushes happiness over the cognitive horizon.   Just remember that one of the definitions of a horizon is “an imaginary line that gets farther away from you the closer you get to it.”

The problem with this method of motivation is that our brains work in the opposite order:  if you raise a person’s happiness in the presentthen their brain experiences a happiness advantage, meaning that performs better than if it is negative, neutral, or stressed.  Every business outcome improves for an employee who has this happiness advantage: people are 31% more productive, they produce 37% more sales, doctors are 19% more accurate at diagnosis, etc.  So if our brain is more positive in the present, than it becomes more successful.

If people do the following 21 days in a row, it can rewire their brains to be more optimistic and therefore more successful.

Activity Explanation
1 3 Gratitudes Write 3 new things you are grateful for each day
2 Journaling positive experience … in a journal, along with one positive experience you have had in the last 24 hours.
3 Exercise 15-20 minutes of vigorous exercise, 3-6 days a week.
4 Meditation 15 minutes of meditation, 1-2 times per day.
5 Random Acts of Kindness Write down one random act of kindness you have done in the past 24 hours to someone you did not know.
6 Lessons Learned Write down how you will take a negative experience you have had in the past 24 hours and turn it into a learning opportunity for the future.

6.  Why does the Gratitude Journal method work?

Here Shawn gives an explanation of these 5 factors; I have added a sixth factor which I explain below.

  1. Writing down the 3 items for which you feel gratitude changes you mind so that it starts scanning the world for the positives rather than the negatives. It doesn’t change the ratio of positives to negatives in the outside world, but it does change which factors you focus on as being the most significant.
  2. Writing about a positive experience you’ve had in the past 24 hours allows you relive it.
  3. Exercise teaches your brain that behavior matters
  4. Meditation allows you to detach from the cultural pattern of ADHD which we are creating through the constant attempts at multitasking, and increases the ability of the brain to focus on the task at hand.
  5. You can write in your journal about a random act of kindness which you performed in the last 24 hours for someone, meaning that you did it without consideration of being paid back by the person whom you helped.  Alternately, perform a conscious act of kindness by sending a note of support to someone in your social support network.
  6. To these activities, I have added a sixth of my own to Shawn’s list, which is to take a negative experience which you had in the past 24 hours, and created some lessons learned from it so that you will experience it in the future not as a threat, but as an opportunity to overcome a challenge.

I have to tell you that Shawn Achor’s method WORKS! I did try it for 21 days and found that I do see live in a more positive way than I did a month ago. The interesting thing for me was that, at first I thought I was just changing the way things were appearing for me, that is, the same ratio of negatives to positives happened out there in the external world, but I was gradually starting to focus on the positives.  The negatives were seen as less and less threatening and more and more as opportunities.

However, by the end of the 21-day period, I was starting to experience more and more positives on the outside.  I think that the positive attitude I took with me while networking, for example, automatically drew people towards me and made them more helpful to me than they would have previously precisely BECAUSE I had a positive attitude.  So it does change your interior “weather” first, but that sunnier internal weather will gradually become reflected in your exterior circumstances.  I don’t know if it will work for everybody, but I recommend that you at least try it, because you have literally nothing to lose, and we could all stand to win a little more, right?

7.  The Neuroscience of Gratitude

In an article written by Ocean Robbins back in October 2013 in a blog called “The Neuroscience of Why Gratitude Makes Us Healthier,” there is additional evidence from neuroscientists that keeping a gratitude journal helps keep people happier than the control group that did not keep such a j0urnal.   Even those people who kept a journal simply describing their lives did not do as well as those who kept a journal to describe things they were grateful for.

Robert A. Emmons, Ph.D., at the University of California at Davis and his colleague Mike McCullough at the University of Miami found that  the gratitude journal group felt better about their lives as a whole and were a full 25 percent happier than the control group.

8.   The Limits of Gratitude

Of course,  I have to caution people against thinking that the gratitude journal alone will be enough to change someone’s brain chemistry if person is clinically depressed.   Stephen Fry, in describing his struggle with bipolar disorder (what used to be called manic depression), said that when you are in the “depressed” part of the cycle, it doesn’t matter how good the internal weather should be, you find yourself living under a metaphorical cloud.    For people whose brain chemistry has severe challenges, just having a gratitude journal will not be enough–you will need professional guidance and medication to alter your brain chemistry to the point where you can live a productive life.

However, for those with “situational depression”, that is, a temporary state of hopelessness or helplessness brought about by traumatic circumstances, and not any particular imbalance in the brain itself, the gratitude journal can lessen the amount of time it can take to snap out of it.

9.  Summary

Gratitude is a feeling that lends itself to a) mindfulness, because you don’t take the blessings of everyday life, both large and small, for granted, and b) a sense of connection, because you realize that your true happiness  comes not from your material possessions, but your wealth in human connections.   This is no more evident than on a holiday like today, on Thanksgiving Day.    So why not make EVERY day Thanksgiving Day?   Get a journal and give yourself the Gratitude Journal Advantage!

 

Agile Project Management Methodologies–Process 4.3 Emotional Intelligence


In the book “PMI-ACP Exam Prep PLUS Desk Reference”, John Stenbeck created an Agile PM Processes Grid, which has 87 Agile PM Processes divided up between the 5 process groups and 7 knowledge areas.

In this series of posts, I am covering the last of three processes in the block of processes that comprise the first process group “Initiate” and the fourth knowledge area, “Team Performance,” which corresponds roughly to the “Human Resources Management” knowledge area in traditional PM.

The last process in this block is process 4.3 Emotional Intelligence.

Elements of Emotional Intelligence

As opposed to the “hard” or “technical” skills one must master to be a project manager, the “soft” skills that deal with managing people rather than projects can be characterized as follows:

  • self-awareness
  • self-regulation (discipline)
  • motivation (both self-motivation and the ability to motivate others)
  • empathy
  • social skills (being able to project confidence, etc.)

Projecting these qualities to team members can’t help but rub off on most them.   However, team members must also treat each other in a way that supports appropriate responses and discourages appropriate responses.   For example, when brainstorming, having an “open mode” frame of mind is important, and belittling someone’s idea discourages that person from ever giving their opinion again.   So this is where ground rules can be helpful.

Ground Rules

Setting ground rules is important on a traditional project as well.   However, rather than you, as the project manager telling everybody what the ground rules are and expecting the team to obey them, in the more cooperative environment of an agile project, the team discuss and define them, and then these rules are posted in a prominent place where people will see them on a regular basis.   This has the affect of making everybody accountable and therefore self-discipline keeps everybody in check rather than some external threat of punishment or hope of a reward.

Two important ground rules are 1) attack problems, not people, and 2) the point of power is in the present, not what people did in the past.   If egos are taken off line, then conflict between alternatives becomes a healthy, and not a toxic, process.

The next post will discuss how the knowledge area of Risk Management is handled in the Initiate phase of an agile project.

Black Diamond Charities and the Veterans PMP Program at PMI Chicagoland


This past Wednesday it was Veterans Day here in the United States, and that got me thinking about the program I volunteered for at the Chicagoland chapter of the Project Management Institute in conjunction with Black Diamond Charities that helps veterans or those who are active duty military personnel who are thinking of pursuing a career in project management

The Veterans PMP program consists of the following three phases:

  1. PMP Instruction (5 weeks)
  2. PMP mentoring (2 weeks)
  3. PMP study group (12 weeks)

Black Diamond Charities (referred hereafter as BDC) goes to where active duty military or veterans are likely to be in the Chicagoland area, such as the Great Lakes Naval Station or the U.S. Army Reserve Training Center, and recruits those who might be interested in the program.   Once they express interest and are enrolled in the next group of candidates for the program, BDC coordinates with the Director of Social Outreach at PMI Chicagoland chapter to get volunteer instructors for the program.    I volunteered to be involved in all phases this time around.

The program started last year around this time and had about 15 participants.    The second round of the program was this summer and had about 30 participants.    The third round that started in October of this year had about 15 participants as well.

PMP Instruction

This phase gives 35 hours of general instruction in project management, and was given by a team of about half a dozen instructors, including myself.     Besides the instruction, the participants were split up into three teams of 5 people each and given the assignment of creating an idea for a project, and not only doing all of the project documents (such as the project management plan), but doing a presentation to the group on the final day of class explaining the project and showing those documents to the project sponsors.    It not only gives them the theoretical foundation through the classroom instruction, but also gives them a hands-on example of what doing a real project is like.

PMP Mentoring

This is a group mentoring session, where we ask the participants from the first phase what topics they would like to hear about more.   The instructor group then gives presentations on these topics split into 2 Saturday mornings.

PMP Study Group

For those that are serious about going on to take the exam, I run a PMP Study Group which covers one chapter of the PMBOK Guide every week.    This not only presents the material in detail, as opposed to the high-level introduction that was done in the PMP Instruction phase.    I will probably do that again this next time, although I’m thinking of doing an online WebEx webinar rather than an in-person study group like I did last time.

Today was the graduation day for the PMP Instruction, and all three groups did great presentations.    I knew they were all nervous about doing well on their presentations, and the relief in the room was palpable when they were done, as was the done they all showed in receiving that completion certificates.

Personally, I got a lot of helping the veterans and feel that my five weeks I sacrificed on their behalf can only repay a fraction of their sacrifice they have already made.    I hope to be involved in the next round of the program and hope that more volunteers from PMI Chicagoland can assist us in this very worthwhile effort!

Agile Project Management Process Grid–Process 4.2 Servant/Adaptive Leadership


In this series of posts, I am covering the first of three processes in the first process group “Initiate” and in the fourth knowledge area, “Team Performance,” which corresponds roughly to the “Human Resources Management” knowledge area in traditional PM.

The second process in this block is process 4.2 Servant/Adaptive Leadership.   I will discuss what agile or adaptive leadership means.   You can say that servant leadership is one of the principles behind it, but let me clear from the start that servant leadership is a principle that ALL project managers should practice, no matter what methodology is used.  However, this principle is particular important in agile methodology.

Servant Leadership–An Introduction

Once when I entered a meeting of the PMI Orange County Toastmasters Club, the Area Governor was visiting and I saw that he had on a shirt that said “Servant Leader”.   I asked him what it meant, and he said to be a leader, you have to serve the people you are leading.   Rather than the traditional management standpoint being that members exist to serve the needs of the leader, this turns that paradigm on its head and dares to say that the leader needs to serve the members.   As an Area Governor, that meant that he visited all of the clubs in his area twice a year, met with the club officers of each of these clubs, and tried to help the clubs get the resources they needed to face their challenges.

In a similar way, the leader of an agile project needs to serve not just the needs of the customer, but the needs of the team.   This approach serves a project manager well in any environment, but it is particularly useful in agile project management.

Servant Leadership

Here are the elements of servant leadership:

  1. Creating an environment of personal safety–this doesn’t mean physical safety, but psychological safety, in other words, a person has to feel free to express opinions and to resolve conflicts between the different opinions of team members when that occurs.
  2. Monitoring skills of team members–this doesn’t just mean skills with respect to agile project management, but technical skills and “soft skills” needed to work cohesively as a team.
  3. Facilitating (not controlling) team meetings–you create ground rules to the extent that they create the environment of personal safety mentioned in element 1 above.
  4. Guiding the decision-making process–this should always be based on creating the most value for the customer.
  5. Removing obstacles that impede progress–this is the “scrum” aspect of leadership where you block others from tackling the person with the ball, or you get handle events or conditions that will impede the person’s path to the goal line.

The focus is not on leading the team in a direction that you have in mind; rather, it is creating the environment in which the team can decide collectively on the best direction to go in.  A lot of these principles can be applied to traditional project management as well.   j.

Agile/Adaptive Leadership

Those principles which are specifically geared towards managing agile projects can be referred to as agile or adaptive leadership principles.  Here are the elements of agile or adaptive leadership:

  1. Adapting to change in the spirit of embracing it rather than avoiding it.   If there are changes to the scope that are suggested, the agile project manager needs to consult with the customer/proxy and decide a) which changes to respond to during an iteration, and b) which changes to defer until an iteration is complete.
  2. Guiding the agile process outcome through adaptive actions, such as:  reducing features, adding an iteration, creating another agile team to handle part of the project, and identifying a new metric.
  3. Adapting the agile framework to the work environment and the customer/proxy.   This is especially true if the customer is relatively new to the agile approach.   The agile project manager might customer its numbering schema for estimating story points, like assigning shirt sizes S, M, L, and XL to them, rather than adhering strictly to the Fibonacci sequence (1, 2, 3, 5, 8, 13, etc.).

The skillset that allows one to be a successful agile leader comes under the rubric of emotional intelligence, being skillful at the so-called “soft skills” of persuading and influencing other people.   Emotional intelligence is, therefore, considered a legitimate tool and technique of agile project management and is the subject of the next post.

Agile Project Management Process Grid–Process 4.1 Coach Recruiting


In the book “PMI-ACP Exam Prep PLUS Desk Reference”, John Stenbeck created an Agile PM Processes Grid, which has 87 Agile PM Processes divided up between the 5 process groups and 7 knowledge areas.    In this series of posts, I am covering the first of three processes in the first process group “Initiate” and in the fourth knowledge area, “Team Performance,” which corresponds roughly to the “Human Resources Management” knowledge area in traditional PM.

The first process in this block is process 4.1 Coach Recruiting.   I will discuss what an agile coach is, and why you should think about getting one for your agile project.

Agile Coach

An agile coach’s mission is threefold:

  1. Trainer–knowledge transfer regarding the agile framework to the team
  2. Coach–applying the agile framework to the specific environment the team will encounter
  3. Consultant–removing impediments that the team may face

The whole purpose of the agile coach is to facilitate teams to create change and improve delivery.   They help the team rethink their assumptions and create mental models so that the team can solve their own problems.

Internal or External Coach

When you think about an agile coach, you probably are thinking about hiring a consultant, which would be an external coach, but someone who is in the company and has reached the level of Certified Scrum Coach can act as an internal coach.  The internal coach has the advantage of knowing the corporate culture and history as well as being familiar with the team.   The external coach can bring a new perspective based on experience dealing with a variety of corporations to bring the best practices to bear on the specific environment that the team will encounter on the project.

The idea is to transfer the knowledge, to have the team apply it, and to gradually fade from the picture, only coming back into it when the team asks for advice.

The next post will cover Process 4.2 Servant/Adaptive Leadership.

Agile PM Processes Grid–The Initiating Process Group and the Team Performance Knowledge Area


In the book “PMI-ACP Exam Prep PLUS Desk Reference”, John Stenbeck created an Agile PM Processes Grid, which has 87 Agile PM Processes divided up between the 5 process groups and 7 knowledge areas.   The 5 process groups are equivalent to the 5 process groups in traditional PM:

  1. Initiate
  2. Plan
  3. Iterate (rather than Execute)
  4. Control
  5. Close

The 7 knowledge areas are a little more complicated, because there is not a clear one-to-one mapping between the knowledge areas of agile PM and the 10 knowledge areas of traditional PM.   Here’s my attempt to correlate the two:

TRADITIONAL AGILE
Integration (various knowledge areas)
Scope Value-Driven Delivery
Time Adaptive Planning
Cost Adaptive Planning
Quality Value-Driven Delivery,

Continuous Improvement

Human Resources Team Performance
Communications Communication
Risk Risk Management
Procurements N/A
Stakeholders External Stakeholders Engagement

You can see it’s not a neat, one-to-one mapping as with the process groups, mainly for the reason that there are 10 knowledge areas in Traditional PM and 7 knowledge areas in Agile PM.

Let’s take the Agile knowledge areas as they appear in the original order and discuss how they correlate.

  1. External Stakeholders Engagement–this obviously correlates with Stakeholder Management in Traditional PM, but notice that it is the first knowledge area rather than the last one as in Traditional PM, which shows the priority that Agile places on feedback to and from the customer throughout the entire set of Agile Processes
  2. Value-Driven Delivery–This covers Scope Management in traditional PM.  In that quality is considered creating a product whose technical characteristics fulfill the functional requirements gathered from the customer, this covers the quality control portion of the Quality Management knowledge area in Traditional PM
  3. Adaptive Planning–This covers the Time and Cost Management knowledge areas in Traditional PM
  4. Team Performance–This covers the Human Resources Management knowledge area in Traditional PM
  5. Risk Management—This covers the Risk Management knowledge area in Traditional PM
  6. Communication–This covers the Communication Management knowledge area in Traditional PM
  7. Continuous Improvement–This covers the quality assurance portion of the Quality Management knowledge area in Traditional PM, rather than the quality control portion which falls more under Value-Driven Delivery knowledge area in the Agile PM Processes Grid.

One additional comparison needs to be made, and that is the difference between the Agile PM Processes Grid and the domains listed by PMI that are covered by its PMI-ACP exam.   This comparison is below.

AGILE KNOWLEDGE AREAS PMI-ACP DOMAINS
1. Agile Principles and Mindset
2. Value-Driven Delivery 2. Value-Driven Delivery
1. External Stakeholders Engagement 3. Stakeholder Engagement
4. Team Performance 4. Team Performance
3. Adaptive Planning 5. Adaptive Planning
5. Risk Management 6. Problem Detection and Resolution
7. Continuous Improvement 7. Continuous Improvement
6.  Communication (included in 4, 5)

What I’ve done in the past two months of posts is go through the grid one block at a time, starting with the first process group in the grid vertically called “Initiate”, and going down horizontally through each of the 7 knowledge areas.   That’s a total then of 87 processes spread across 7 x 5 = 35 different blocks.  I’ve completed the “External Stakeholders Engagement”, “Value-Driven Delivery”, and the “Adaptive Planning” knowledge areas for the first process group, and in the next couple of posts I move on to the fourth block, the knowledge area “Team Performance”, which covers the same area as “Human Resources Management” in traditional project management.

Here are the three processes in this fourth block covering “Team Performance”:

  1. Coach Recruiting
  2. Servant/Adaptive Leadership
  3. Emotional Intelligence
The next post will cover the first of these three processes, Coach Recruiting.