Six Sigma Green Belt–Management Tool #4: Prioritization Matrices

The prioritization matrix is also called the criteria matrix and is a tool used to help in the decision-making process. It can be used when deciding which Six Sigma projects to work on, in deciding which design features are Critical to Quality, or in making a decision with regards to any set of criteria such as the frequency, severity, and difficulty of dealing with a set of risks.

Step Description
1. Develop Criteria These are the dimensions which you will use to analyze the various options. They should be listed on a row at the top of the matrix.
2. Determine Options What are the various options under consideration? They should be listed on a column to the left of the matrix.
3. Develop Weighting Each criteria should be assigned a numerical weight from 1 to 10, or some other similar scale.
4. Score Each Option Take each option and go across the list of each criteria, giving them a weighting from 1 to 10 based on the scale you developed in step 3. Each row should have the various weightings for each particular option across the various criteria.
5. Add up Columns Take the total scores for each column and each row. Sum up the columns and rows (check: they should be equal).
5. Rank Options Let’s say the total comes to 100. Then divide the total for each row by the total for the entire matrix, which will then give you a decimal ranking from 0.00 to 1.00 for each option. Rank each options with the highest decimal ranking at the top, and going downwards from there.

Or you can simply list the rankings on a numerical basis without the decimal conversion; it’s your choice.

6. Discuss Results Discuss the results of the exercise and make a decision based on the option with the highest score.

This tool is used only after the various options are clearly known, so it is best to be done after some other brainstorming tools are performed to identify them.


Leave a Reply

Fill in your details below or click an icon to log in: Logo

You are commenting using your account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: