Memrise–Building the Memory Palace a Brick at a Time


In a previous post about language learning, I discussed Duolingo, a language-learning app that I use on a daily basis to learn European languages.   The ONLY criticism that I have about the program is that I wish it also offered non-European languages, that is, languages other than those in the Indo-European family which for the most part (with some exceptions such as Greek) are written with the Latin alphabet.    The languages I had in mind in particular are Chinese, and Japanese, both of which I have studied before, and Korean and Hindi, which I have not.

However, the interface can only handle the current languages based on the Latin alphabet, so I remained contented in my disappointment, until I found a recommendation by Benny Lewis, author of the blog Fluent in 3 Months (and a new book with the same name), that to memorize vocabulary in ANY language, one should try Memrise.

I tried that recommendation and now am practicing Japanese and Chinese an a daily basis along with my daily Duolingo language practice for European languages.   In the rest of this post, I would like to discuss the features I like about Memrise.

to be continued on 03/02/2015

Leave a Reply