Great Books of Western Literature: The Plays of Aeschylus (1)


1.  Introduction

In 1994, Harold Bloom, the Sterling Professor of Humanities at Yale University and Berg Professor of English at New York University, wrote The Western Canon: The Books and School of the Ages, in which he argued for the more conservative viewpoint that literature should follow the “art for art’s sake” ideal and not have it be subservient to some program of social engineering or political correctness.

After I moved to Chicago last summer, I found that the local library, together with the interlibrary system that stretches across the libraries of the Chicagoland area, is a wonderful resource.   I re-read Harold Bloom’s book and decided to embark on a program of reading (and in some cases, re-reading) the Great Books of Western Literature, in particular as set forth by

  • The Great Books of the Western World series by Encyclopedia Brittanica
  • Harold Bloom’s book The Western Canon: The Books and School of the Ages

The plays of Aeschylus, along with those of Sophocles, Euripides, and Aristophanes, are contained in the second volume of literature in the Great Books of the Western World series.    There are seven extant plays of Aeschylus included in the Great Books, and this post covers four of them:   The Persians, Seven Against Thebes, The Suppliants, and Prometheus Bound.   Tomorrow’s post will cover the remaining three plays that coincidentally represent the only extant trilogy we have for any of the Greek tragedians.   The trilogy is called the Oresteia, and consists of Agamemnon, The Libation Bearers, and The Eumenides.

For a synopsis of the work, I ask that readers turn to the Wikipedia article on Aeschylus and refer to the section on Synopsis.   I will focus on 5 themes of the these plays as I encountered it in my reading and listening to the work.

2.  5 Themes

to be continued tomorrow

Great Books of Western Literature: The Odyssey


 

1.  Introduction

In 1994, Harold Bloom, the Sterling Professor of Humanities at Yale University and Berg Professor of English at New York University, wrote The Western Canon: The Books and School of the Ages, in which he argued for the more conservative viewpoint that literature should follow the “art for art’s sake” ideal and not have it be subservient to some program of social engineering or political correctness.

After I moved to Chicago last summer, I found that the local library, together with the interlibrary system that stretches across the libraries of the Chicagoland area, is a wonderful resource.   I re-read Harold Bloom’s book and decided to embark on a program of reading (and in some cases, re-reading) the Great Books of Western Literature, in particular as set forth by

  • The Great Books of the Western World series by Encyclopedia Brittanica
  • Harold Bloom’s book The Western Canon: The Books and School of the Ages

The Iliad, along with the Odyssey, is contained in the first volume of literature in the Great Books of the Western World series.    Along with the Odyssey, I read notes to the Odyssey by various scholars that were edited by Harold Bloom himself.    However, since the work was originally a work of oral poetry, I went and downloaded the LibriVox recording of the 24 books of the Odyssey to listen to them as well as read them.

For a synopsis of the work, I ask that readers turn to the Wikipedia article on The Odyssey and refer to the section on Synopsis.   I will focus on 5 themes of the work as I encountered it in my reading and listening to the work.

2.   5 Themes

a.   Post-Trojan Stress Disorder or the Perils of Peace

After reading the Iliad, one of the things you notice about the Odyssey is that it is not just an interesting work in and of itself, but it becomes doubly so if you compare and contrast it with the Iliad.

First of all, the Iliad is about the world of war, which we enter in its 10th year.   The Odyssey is the story of what happens to Odysseus, one of the leaders of the Trojan War, upon his return to Greece.   It takes him 10 more years to get back to Greece, however, and the Odyssey tracks his various adventures as he gets repeatedly thrown off course and sidetracked.   And yet, he always has the goal in mind to return to his wife Penelope and his son Telemachus and after a decade of perseverance, he finally manages to do so.    In all of the physical travels, you get the sense when reading the work that part of the journey that Odysseus goes on is the transformation of his whole being which has been bent on war and his role as a warrior, and now must focus on peace and his role as a father and husband–not, however, until he commits a final war-like act by slaying the suitors of his wife Penelope that are eating him out of house and home.

The stories of the return of the heroes of the Iliad are collectively referred to as the Nostoi, or the stories of the return, and all of them show the difficulties in the warriors who have faced 10 years of war in returning to a life of peace and domestic concerns.    Agamemnon returns to his wife Clytemnestra and is killed by her, because he sacrificed their daughter in order to obtain favorable winds from the gods on his way to the Trojan War.    (This is the subject of a trilogy of plays by the playwright Aeschylus, by the way, which comprise another one of the Great Books.)    So the passage from war to peace is not an easy one, and is fraught with peril.

b.  Reconciliation of the male and the female

One of the psychological shifts that has to go on in Odysseus’ mind is not just the shift from war to peace, but the way in which he interacts with women.    In the Iliad, women are, as they were in much of Greek culture, not the equal of men, but are considered as property and part of the “spoils of war.”   In fact, the opening of the Iliad starts with a quarrel between Achilles and Agamemnon over that king’s taking the woman Achilles has won as one of the spoils of war.    We only see one real female character of consequence in most of the book, and that is Helen, and she is perhaps the largest spoil of war over which the entire Trojan War is being waged.

Odysseus has to come from that world to the world where he has to interact with women as a father to a daughter, as a husband to a wife, and a son to his mother.    The relationships he has with women such as Nausicaa, or with Circe, help pave the way to his ability to maintain once more domestic relationships with women.

c.  From War Epic to Science Fiction

If we were to consider the Odyssey from the standpoint of view of modern fiction, it would probably be more of a work of fantasy or science fiction, rather than the Iliad, which is more of a war epic.    This is because of the various fantastical adventures he goes on with giant Cyclops, singing Sirens that lure men mad with their songs, and other unusual creatures of mythological lore.    It lends an atmosphere of fantasy or “augmented reality” if you will, rather than the gritty reality of the Iliad.

d.  From Physical Hero to Mental Hero

Achilles, the hero of the Iliad, is strong, brave, and has a lot of positive qualities you would want in a leader during a war, although he does have the weakness of pride which almost proves his undoing.     The Odyssey, on the other hand, is a work which has Odysseus as a hero, and he has a lot of positive qualities that are more mental than physical, such as the ability as a storyteller and a liar, which are more needed against the supernatural foes he runs up against as opposed to the physical foes that Achilles faced in the Iliad.    He, like Achilles, has his weaknesses, such as the hubris or over-confidence that he sometimes displays, such as when he taunts the giant Cyclops after successfully leaving in a boat from their island.     The giant boulder the Cyclops throw at the boat almost causes it to capsize, showing that his boasting, a form of hubris, almost proved his undoing.

e.   From the Arrow to the Circle

The action of the Trojan War in the Iliad may start in Olympus and in Greece, but it ends with the Trojan War, and the attempt to destroy that city.    The action of the Odyssey, however, turns this arrow of action backwards and, after the peregrinations of Odysseus, finally returns him to the place where the adventure started back in Greece.   However, although he is returning in place to the starting point, he is returning to that point 20 years later, and much has happened in those 20 years, including the growth of his son from a boy into a man.    Luckily, there are some things that are constant, such as his wife Penelope’s faithfulness to him, and that is what causes the book to have, as we would say today, a happy ending.

3.  Conclusion

There is some debate as to whether Homer wrote both works, but I think those who think he did not write both are doing so because of they find it difficult to find that one man could write works of such contrasting themes.   But when you read the two works, you know that they are written by the same man, because the rhythms of the sentences, with their repeated words, phrases, or indeed entire passages (like the descriptions of animal sacrifices) leave one no doubt that the same genius is at work.

Of the two works, I must say that the Odyssey has a power over me that the Iliad did not, but that is probably because of my own penchant for science fiction, which escapes certain boundaries created by the rules of realism in order to tell larger truths about the world in which we live.   For that reason, it is one of those works I would enjoy re-reading. Just as Odysseus’ adventures made him a larger person because of the experience, reading about his adventures in the Odyssey also makes me a different person, a larger self, than I was at the beginning of the story.    That is why it is a Great Book of Western Literature.

 

Integral Theory and Interfaith Dialogue


At the Unitarian Universalist Community Church in Park Forest, I gave a talk on Integral Theory and how it could be used to foster interfaith dialogue.

In the talk, I introduced the five elements of integral theory and gave examples of how an awareness of the theory could improve communications within the church itself, between the church and other religious institutions, and between church and the society at large.    This is not meant as an in-depth explanation of Integral Theory, which I explain in other posts, but rather its application towards the subject of using it as a tool to enable dialogue between church members and those who may have different perspectives, whether they be church members, members of a different church, or someone else in the community with whom the church member wants to converse about any given topic.

1.   Quadrants

The four quadrants represent the four different perspectives one can use when approaching reality, the intentional, the behavioral, the cultural, and the social.

Here’s an example of how using an awareness of quadrants helped in a discussion within the church.   At a different UUCC chapter in Orange County, CA, I had led a forum whose focus was on the obesity epidemic in America.   What were its causes, and what were potential measures that could be used to combat it?

One person said it was a matter of will power; people just needed to be stricter about dieting.    Someone else pointed out that all the intention in the world to diet doesn’t overcome the fact that restrictive dieting alone won’t help you lose weight because of the physiology of the body.    If you start restricting calories, you start your body craving food more and more until you gave into those cravings and ruin the diet.

Someone else said it was a problem of people buying too much junk food, and someone then pointed out that the reason why they do that is because there are so many commercials on TV encouraging people to engage in this unhealthful behavior.    Finally, someone said that the government was subsidizing agribusiness and not local farmers, which meant that the cost of junk food was artificially low but that the cost of healthful fruits and vegetables was so high that most poor people could not afford it.   They preferred junk food not just because of the commercials, but because government subsidies distorted the “free market” to the extent that it was cheaper for them to buy it.

When I heard this, I realized that all of the perspectives were valid according to Integral Theory.   The comment about will power had to do with intentions, and the physiology of the body shaped the behaviors of people when they were diets.    The culture affected people’s purchasing decisions, but so did the social structures just as the government’s policies towards giving subsidies to certain large corporations but not to small, family farmers.   The problem in such a discussion becomes when people think that their perspective has a monopoly on what the real truth is.   No, their perspective contains only a piece of the truth.    Understanding this concept is key to really being able to listen to the perspective of others.

2.  States

The basic states of consciousness are waking, sleeping, and dreamless sleep, with a potential fourth state called nondual occurring in situations where people have peak experiences.   For church members, I said the important thing for them to pay attention to there is the fact that if you go on a retreat and have a peak experience, it may give you a momentary higher state of consciousness, but if that higher state is not nurtured through continuous practices, it will fade away back to a normal state.

Also, when people have these peak experiences, they will interpret them through the lens of their own belief system, so if you talk to someone who believes in the existence of the Devil, you may have to translate that into your own belief system in order to understand where they are coming from.    This actually happened with someone out in California who I was networking with frequently.    I said, “sometimes I think I am getting an impulse from my ego rather than my larger self, and you talk about getting an impulse from Satan.”   I asked him, “do you think we might actually be talking about the same phenomenon?”   He considered this, and said, “maybe we are.”

3.  Lines

An important thing to remember about lines of development is that besides the cognitive line of development which is the thing measured by scholastic or IQ tests, there are other intelligences such as emotional intelligence, a moral sense, and other lines of development which are also important in the larger scheme of human interactions.    Here’s an example of three levels of development, and how a hypothetical person measures up to them along different lines.

The important thing for UUs to remember here is that just because you are developed along one line, doesn’t mean that you are going to be developed at the same level along another line.   Also, when putting together teams of people to handle a task, it is good to have a mix of people with different strengths along different lines of development.

4.  Types

Of course, the biggest type difference we encounter in daily life is that of gender, the sex with which we identify, and sexual orientation, which is the sex to which we are attracted.   Other types to be aware of are communication preference types.   If you are trying to give a talk or a sermon, you need to include elements for those people who have the preference of a) action, b) ideas, c) processes, and d) people when communicating.    Give takeaways of actions people can take for the people who prefer action, discuss ideas by using quotes and giving statistics or names of books, give a beginning, middle, and end to your sermon for people who like orderly processes, and tell emotive stories for the people who communicate in terms of relationships with other people.

5.  Stages

There are eight stages of development according to Spiral Dynamics, which Ken Wilber has incorporated into the Integral Theory model. These represent the “units of concern” that a person has starting out with the obvious egocentric levels.   Gradually, a person starts to care for more than him or herself and the immediate and/or extended family; the person learns to identify with a particular religion, race, ethnic background, and that is the ethnocentric level.    If you identify with the people of the country at large, you are at the sociocentric level.  Those who are concerned about all human life can be said to be at the worldcentric level.

These are the first tier stages, as contrasted with the second tier stages.    Those in the first tier usually identify those groups to be contended with as all of the other stages; however, those at the second tier recognize that those at lower tiers are just at different stages of development.    As a UU, you are going to encounter those who are at different stages, and I don’t mean to imply that you should use this to feel superior to them in any way.   I am saying this to let you know that you if you want to communicate with a person at a different stage, you need to adopt their language to get through to them.

For example, if you are at the green level and want to enlist the participation of someone in your campaign to stop the Keystone XL pipeline, then you will need to get a sense of what stage they are in.   You are not going to be able to argue about global warming to someone at the orange level who thinks that the Keystone XL pipeline is going to bring in much-needed jobs to the country.   You will have to talk to that person in terms of economic pros and cons of a short-term nature, rather than the long-term, global consequences of that pipeline.   And you will have to deal with the self-interest of someone in the amber or red level in terms of the effect of that pipeline on the quality of their drinking water and how it affects them or their community personally.

6.  CONCLUSION

The purpose of gaining the ability to perceive multiple perspectives is essential in communicating with others, and Integral Theory provides a framework with which to do this.   The talk was well-received this morning at the church, and there was much discussion afterwards, which showed that it stimulated some thinking about how it could be used in practical situations involving communication both within the church and in the larger community.   For that reason, I call it a successful talk.

World Champion of Public Speaking Pres Vasilev: 10 Tips on Structuring your Speech


On Saturday, February 22nd, at the Toastmasters Leadership Institute held by District 30, the 2013 World Champion of Public Speaking Pres Vasilev gave a keynote speech about how to structure your speech to make it more effective.  He used famous speeches in history, plus his own speech “Changed by A Tire”, with which he won the International Speech Contest last year, as examples of the points he was trying to make.

1.   Repetition creates Rhythm

If you read the works the Iliad and the Odyssey by Homer, you realize that he repeats certain phrases such as “rosy-fingered Dawn” and even entire passages, such as when describing the ritual of an animal sacrifice.   In a speech, you have only 5-7 minutes to create an impression, so reinforcing your message through rhythm, which means repetition of phrases, becomes important.    Another element that contributes to rhythm is word order, which you can vary to draw attention to the words of your speech.

2.  Beginning Echo

One form of repetition is beginning echo, which is when the beginning of one sentence echoes the beginning of the preceding sentence.   An example from historical speeches is the phrase “I have a dream …”, which Dr. Martin Luther King, Jr. used to punctuate his famous speech in the nation’s capital.

3.  Ending Echo

If beginning echo is repetition at the beginning of the sentence, then ending echo is naturally the ending of one sentence echoing the ending of a the preceding sentence.   An example from historical speeches is the phrase “Yes we can!” which President Barack Obama used to punctuate his acceptance speech of the nomination for President at the Democratic National Convention in 2008.

In Pres Vasilev’s own speech, he used the phrase

the jack collapsed,

my car collapsed,

my lungs collapsed”

as an example of ending echo.

4.  Full Circle

Combining the beginning echo and ending echo gives you the full circle, where the ending of the sentence echoes the beginning.    For example, in a previous World Championship of Public Speaking speech, someone used the phrase

“I had changed everything in my life,

but nothing had changed.”

This shows the word “changed” which occurs towards the beginning of the sentence in one context, and also at the end of the sentence in another contrasting context.

5.  Chain of Change

This is where the ending of one sentence echoes the beginning of the subsequent sentence, creating a chain of change.    He used the words of the philosopher Yoda from Star Wars I movie:

Fear leads to anger

Anger leads to hatred

Hatred leads to suffering.

6.  Sudden Twist

This is a chain of sentences, where the last sentence changes the level of discourse, usually from serious to comic.  He used an example from his own speech,

If you want a better voice, reach out to a singer

If you want better writing, reach out to a writer

If you want better tire-changing skills, reach out to me

Here there is a sudden twist from the serious (a better voice, better writing) to the comic (better tire-changing skills).

7.  Balanced Contrast

When you have two sentences that have parallel structure, they create an impression which is stronger than each of them individually by creating a balanced contrast.   From the words of Neil Armstrong when he became the first man to step on the surface of the Moon:

That’s one small step for a man

One giant leap for mankind

Notice the parallels in contrast:   “small” vs. “giant”, “step” vs. “leap”, and “a man” vs. “mankind.”   Each of these ties the one incident, that of a single man stepping on the surface of the Moon, with the larger framework of the entire history of man.

8.  Reversed Order

In this parallel structure, the second sentence has a structure which is the reverse of the first sentence.   For example, here’s an example of reversed order from a line from one of John F. Kennedy’s speeches:

Ask not what your country can do for you

Ask what you can do for your country

From Pres Vasilev’s own speech, he cited the line

I stopped to change a tire

Instead the tire changed me

and later on in the speech

I used to believed that to reach out was a weakness

But I discovered my weakness was refusing to reach out

9.   Sublime Rhyme

What was the one phrase that people remember from the trial of O. J. Simpson:

If it doesn’t fit, you must acquit

When you create a sublime rhyme at the end of your speech, you will give it a sense of finality and an echo of what came before during the entire speech.

10.  Pauses

One often overlooked element of creating rhythm in speeches was the use of pauses.   In terms of word count, Pres Vasilev’s speech was the shortest.   This allowed him to use pauses to contrast one block of the speech text with another.

Pauses are important because they give time for the audience to reflect, and for you to connect.

CONCLUSION

Even in this last sentence of his presentation “time for the audience to reflect, and for you to connect”, Pres Vasilev showed an example of the power of structuring the sentences in your speech to give them more resonance with the audience.   

The most amazing thing about Pres Vasilev is that he won the world championship of public speaking–and English is not his first language.   Originally from Bulgaria, he came here and decided to use Toastmasters as his way of helping him improve his communication skills in English.    If he can go all the way to the top in a language that is not his mother tongue, then I can say for certain that none of us for whom English is our first language have any excuse for not trying to improve!

Global Risk Report 2014–10 Suggestions for Improving Risk Response


Introduction

The first two parts of the Global Risk Report 2014 deal with processes that are analogous to some of the planning processes of Risk Management used in project management: Plan Risk Management, Identify Risks, and Perform Qualitative and Quantitative Risk Analysis. Part Three of the Global Risk Report 2014 deals with the next process, which is Plan Risk Responses.

The last post dealt with some of the specifics of risk responses for managing catastrophic, global risks.   This post discusses 10 suggestions the Global Risk Report 2014 makes for improving risk responses.

1.  Have firms nominate Chief Risk Officers (CROs)

To show that the formulation of risk responses is a top priority of firms or even national governments, the World Economic Forum (WEF) recommends the establishment of C-level risk officers of CROs to change the short-term focus on quarterly profits into long-term focus on sustainable growth with preparedness for setbacks caused by global risks.

2. Have governments nominate cabinet-level national risk officers

The equivalent to CROs in firms would be a cabinet-level national risk officer, a Secretary of Risk to use the parlance of the US Government.   Financing of risk-financing practices would be done in cooperation with the Secretary of the Treasury, and wargame-type simulations would be done in cooperation with the Secretary of Defense.

3.  Change executive remuneration to contingency bonuses

To change the thinking of executives for a company, rather than rewarding C-level executives for better quarterly performance, have the bonuses be awarded on a more long-term contingency basis.    Will the policies the executives initiate now still be profitable to the company, say, 5 years from now?    This would force them to think beyond their “term of office”, so to speak.

4.   Spread risk-response costs over time

Since the more catastrophic risks are those that will continue to persist for some time, it makes sense to amortize the investments in measures that enhance resilience to those risks over time as well.    This will make the upfront payment for those measures more palatable for senior management.

5.  Negotiate longer-term insurance contracts

In parallel with the technique mentioned in paragraph #4 above, which is predicated on the assumption of risk and the contingency measures to handle them, transferring risk to a third party through insurance can also be used as a risk strategy.   In this case, a firm could negotiate longer-term insurance contracts that have lower premiums to reflect investment in protective measures.   As it says on p. 47 of the Global Risk Report 2014, “If the premium savings exceed the annual costs of a long-term loan to finance the investment, the mitigation measures will be cost-effective and financially attractive to undertake.”

6.  Offer longer-term loans to cover investments in risk resilience

If you are trying to help countries take steps to reduce risks from adverse events, offering longer-term loans to cover investments in resilience to those events would help foster longer-term thinking.    These measures of resilience would include such things as improving building codes to cope with floods, earthquakes, and other natural disasters.

7.  Have risk officers dramatize risk events

Risk officers should learn to communicate not just with abstract statistics, but with methods of communication that relate to people who have other preferences for getting information.   An example in California was the Great California Shakeout held on October 28, 2012, an event which dramatized what might occur doing a major earthquake.   It offered an opportunity for ordinary citizens as well as emergency responders to consider improving their preparedness for a potentially damaging earthquake.

8.  Have risk officers help avoid “risk perception” errors

Most people overemphasize the future probability of occurrence of risks that have recently happened, or those which have great impact on human life and have been extensively covered in the news.    The problem with the latter, for example, is that there is that there is a concomitant underemphasis on risks that are more likely to occur, although they have lesser impact.    Everyone worries about being hurt by buildings or highways that collapse in an earthquake.   But out of those people, how many have emergency water or food rations stored in their house or apartment?   Running out of food and water is a statistically much more likely event to occur than having one’s house fall on you, and yet it is a contingency for which too few people prepare.

9.  Have risk officers use discussion of risks to empower employees

One of the reasons why companies do risk response strategies is so that the management can have peace of mind knowing that there is something that can be done in case a risk occurs.   The same psychology holds true with individuals, so risk officers should take advantage of this and use this as an aid to starting the conversation with all members of a firm about how to take an active part in the mitigation of risk.

10.  Have risk officers use checklists to help firms brainstorm about risks

Identification of risks is as fundamental to the success of a project as identification of the technical requirements of that project’s final product.   And in a similar way, the process of gathering these risks should be parallel to that of gathering requirements:   in needs to be done with as many stakeholders as possible; not just those on the project itself, but by those affected by the project in some way.

Checklists can be a way of breaking down what is a conceptually difficult topic for people such as risk into a form that can cause them to break the topic down into concrete questions that are more easily answered.

These suggestions from the Global Risk Report 2014 are good for any organization that is dealing with global risk, be it a corporation, an academic institution, a non-profit organization, national government, or international organization.

CONCLUSION

This is my final post on the Global Risk Report 2014.   I have written posts about the 2012 and 2013 versions of this report, but this year I have spent three whole weeks on posts covering one end of the report to the other.   I did it for my education, because it is one of the most important documents to come out of the World Economic Forum each year.   I can only hope that some of the readers out there will be interested enough by reading these posts to look up the source document itself, which is at the following web address:

http://www.weforum.org/reports/global-risks-2014-report

Global Risk Reports 2014–Managing Catastrophic Risks


1.   Introduction

The first two parts of the Global Risk Report 2014 deal with processes that are analogous to some of the planning processes of Risk Management used in project management:  Plan Risk Management, Identify Risks, and Perform Qualitative and Quantitative Risk Analysis.   Part Three of the Global Risk Report 2014 deals with the next process, which is Plan Risk Responses.   In the last post, I talked about general risk response strategies.   A summary of this discussion is contained in the next section.

This post deals with the specifics of risk responses for managing catastrophic, global risks.   Because of the global scale of these risks, any attempt to effective manage such global risks will itself have to be global in scale.

2.  General Risk Strategies

There are four general strategies for dealing with risk, depending on whether they are negative risks (threats) or positive risks (opportunities).  Which strategy to use depends on two factors:  the probability of the risk occurring and the impact that it would have on the project if it were to occur.  For the sake of simplicity, let’s categorize both the probability and impact of a risk into high and low categories.  Then we have the following matrix for negative risks and positive risks:

Probability Impact Strategy (-) Strategy (+)
High High Avoid Exploit
Low High Transfer Share
High Low Mitigate Enhance
Low Low Accept Accept

Let’s take a look at the four general risk response strategies for negative risks avoid, transfer, mitigate, and accept, and discuss how applicable these strategies are for global risks.

3.  Strategies for negative risks or threats

Let’s first discuss the two risk strategies that are the least applicable to global risks.

a.  Avoid

If the probability of occurrence of a particular risk and its potential impact were it to occur are both high, you would normally want to avoid that risk.    Note that the global risks that were considered to be of highest concern in the Global Risk Report 2014, which are contained in the following list, are defined as those that have both the highest probability of occurrence and the highest potential impact if they occur.
# Global Risk Risk Category
1 Fiscal crises in key   economies Economic
2 Structurally high   unemployment/underemployment Economic
3 Water crises Environmental
4 Severe income disparity Economic
5 Failure of climate change   mitigation and adaptation Environmental
6 Greater incidence of   extreme weather events (e.g. floods, storms, fires) Environmental

If a company is contemplating a project with a risk that has high probability and impact, the avoid strategy may work by avoiding that  project altogether, or at least the portion of the project with that high risk.  For example, an automobile company that has expertise in normal manufacturing processes may outsource the production of a high-risk component, such as an airbag system, to a company that specializes in the manufacture of that type of component.

But when you have risk #6, the greater incidence of extreme weather events on a global scale, for example, how are you supposed to avoid that?   This is why the avoid strategy is impossible for global risks, because they are, by definition, global in scope.

b.  Transfer

Now if a risk is low in probability, but high in potential impact, a strategy that a firm can use is to transfer the risk, or a portion of it, to a third party that specializes in handling risk.   For example, the probability of my getting into a car accident is low (fortunately), but the potential impact to me if my car were to get into an accident could be great, even life-threatening.   Since it doesn’t happen that often, I can pay a certain amount, called a premium, to an insurance company.   The premiums are pooled together (and invested), and if there is an accident, the money to pay for car repair and/or medical bills for any injured people is taken out of this pool.    Insurance companies can even transfer risk to other insurance companies, called reinsurance companies.   For catastrophic risks, governments will have to pay money for the response to disasters, which then spreads the costs across all of the taxpayers.

The problem with a risk like #6 is that the impact may be greater than even reinsurance companies, or perhaps even governments, in the wake of recent fiscal crises, can bear.   So transfer of global risk is the second least desirable risk response strategy.

What then are the best two risk response strategies to take with regards to global, catastrophic risks?

c.  Mitigate

A fourth strategy occurs when either the impact or the probability is high, and that is to mitigate the risk by lowering the probability of it occurring, or reducing the impact on the project if it occurs.   This can be done with the threat of climate change, by reducing the emission of greenhouse gases, for example, which would lower the probability, or the avoidance of giving permits for building projects that come within a certain distance of coastal waters, which would lower the impact of flooding if it were to occur as a consequence of climate change.

This is the best long-term strategy, but because the effects are long-term, persuading governments to forego a portion of short-term economic growth to invest in the reduction of longer-term risk may take persistent, multidirectional dialogue with those governments.

d.   Accept

A shorter-term strategy is to accept the risk, in the sense of accepting the necessity for creating contingency plans for that risk.   Now, these strategies are not mutually exclusive.   You can develop contingency plans for risk, let’s say, of climate change, while at the same time you make efforts to reduce the probability of its occurrence.

In my opinion, to accept and mitigate are the most effective and efficient portfolio of strategies to take regarding global, catastrophic risks.

4.   Public-Private Partnerships for Managing Catastrophic Risks

Any strategy for managing global catastrophic risks will also have to be global in scale, but it will also have to include buy-in from multiple stakeholders:  from the private sector, from non-profit organizations, and from governments in order for it to succeed.

These public-private partnerships will have each sector bring something unique to the table, as is shown in the chart below, with research and development, however, being something to which both sides can contribute.

Public Sector

Private Sector

Disaster management organizational framework Community engagement
Legal protections Innovative business processes
Personnel and training Products and supplies
Research and development Research and development

Like any project, successful public-private partnerships can

  • identify and agree to outcomes and objectives,
  • establish roles and responsibilities,
  • leverage environmental factors that support such partnerships, and
  • mitigate any environmental barriers to the successful implementation of such partnerships.

As it says on p. 45 of the report, “The World Economic Forum’s Global Agenda Council on Catastrophic Risks works to codify and articulate such leading practices about how public-private partnerships can work.

A cultural shift is under way, out of necessity, towards the creation of public-private partnerships to address catastrophic risks.  Analyzing the establishment and operations of these partnerships, as well as the effective use of the partners’ collective capabilities, is a vital step towards strengthening communal security and resilience.”

5.  Conclusion

Managing global, catastrophic risks may seem a daunting task, and people may think, “well, I’m just a drop in a limitless ocean of humanity, what can I do?”  To quote from the movie Cloud Atlas, “yes, but what is the ocean but a multitude of drops?”

There really is no alternative to facing these risks.   As the final words of the protagonist in the 1936 movie “Things to Come” says while pointing to the stars, “for man, there is no rest and no ending.  He must go on—conquest beyond conquest. . . If we’re no more than animals—we must snatch at our little scraps of happiness and live and suffer and pass, mattering no more… All the universe—or nothingness… Which shall it be?”

If we refuse to manage these risks, particularly the threat of global climate change, our children and grandchildren may be facing the specter of nothingness.    The choice is clear.

Global Risk Report 2014–Risk Response Strategies


1.   Introduction

The first two parts of the Global Risk Report 2014 deal with processes that are analogous to some of the planning processes of Risk Management used in project management:  Plan Risk Management, Identify Risks, and Perform Qualitative and Quantitative Risk Analysis.   Part Three of the Global Risk Report 2014 deals with the next process, which is Plan Risk Responses.

2.  General Risk Strategies

There are four general strategies for dealing with risk, depending on whether they are negative risks (threats) or positive risks (opportunities).  Which strategy to use depends on two factors:  the probability of the risk occurring and the impact that it would have on the project if it were to occur.  For the sake of simplicity, let’s categorize both the probability and impact of a risk into high and low categories.  Then we have the following matrix for negative risks and positive risks:

Probability Impact Strategy (-) Strategy (+)
High High Avoid Exploit
Low High Transfer Share
High Low Mitigate Enhance
Low Low Accept Accept

3.  Strategies for negative risks or threats

a.  Accept

As can be seen, if the risk is low in terms of probability and impact, you can simply accept it.   Accepting a risk does not mean ignoring it:  risks in these categories that are accepted are put in a watch list.   During the course of the project, this watch list should be reviewed to see if the probability and/or impact of the risk has increased.

b.  Avoid

On the opposite end of the scale, if the probability and impact are high, you should so all you can to avoid that risk.    Some ways of avoiding risk are by clarifying requirements so that the potentially high-risk portions of the scope are excluded, or if the risk is to the schedule, by extending the schedule.

c.  Transfer

Now, if the impact is high and the probability is low, you may want to transfer  the risk to a third party.    Examples in the case of manufacturing would include the purchasing of product liability insurance or, if the risk has to do with a certain component, outsourcing the manufacturing of that component to a company that is better equipped to handle it.

d.  Mitigate

A fourth strategy occurs when either the impact or the probability is high, and that is to mitigate the risk by lowering the probability of it occurring, or reducing the impact on the project if it occurs.

4.   Additional Risk Strategies

Besides the basic four strategies listed above, there are more specific strategies that are mentioned in the Global Risk Report.    Most of these are for the reduction of the potential impact of a risk if it were to occur, so they can be considered specific examples of the general “mitigate” strategy listed above.

Risk Strategy Explanation
Accountability Measures Finding ways to incentivize individual employees   not to cut corners in ways that would normally be undetectable but would   increase a firm’s vulnerability in a crisis, such as failing to maintain   back-ups. Some firms hire external consultants to assess how effectively they   are mitigating risks identified as priorities.
Supply-chain Diversification Sourcing supplies and raw materials from   multiple providers in different locations to minimize disruption if one link   in the supply chain is broken. Another hedge against sudden unavailability of   inputs is to maintain an excess inventory of finished products.
Early-Warming Systems Some firms employ their own teams to scan for   specific risks that may be brewing, from political crises, for example, to   storms off the coast of Africa that may become hurricanes in the US in the   next fortnight.
Simulations and tabletop exercises Many firms simulate crisis situations; for   example, by making critical staff unexpectedly unavailable and assessing how   other employees cope. Such exercises can capture lessons to be integrated   into the risk-management strategy.
Back-up sites Many firms are set up so that if one or more   factory or office becomes unusable, others are quickly able to assume the   same functions.

5.  CONCLUSION

This gives an example of the kind of risk response thinking that firms use in project management and in enterprise-level risk management.   These principles must be adapted to global risks, and the next post will give examples of risk response strategies discussed in the Global Risk Report 2014.

 

Happy 60th Birthday, Homewood-Flossmoor Toastmasters Club!


In February 1954, a new chapter of the Toastmasters International Club called the Homewood-Flossmoor Toastmasters Club became club #1451.   This club in the south suburbs of Chicago is now 60 years old, and our club is celebrating tonight at an Open House!

The club is undergoing a renaissance, as we have increased our membership from 18 members to 22 members, and we are regularly sending representatives to the Area Speech Contests held once in the Spring and once in the Fall.

Our membership is not at present what you might call a “seasoned club” in that have no Distinguished Toastmasters, although I hope to have that distinction at the end of the next Toastmasters Club year.

What makes the event poignant is that earlier today, I attended a meeting of another club, the Richton Park Toastmasters Club, that had its first “demonstration” meeting.   I am a sponsor of that club, and the response we got was so enthusiastic that we may end up chartering it as a new club within a month.   So seeing a new club be born on the same day that we celebrate the “ripe old age” of my home club is a really momentous occasion.

I hope to add additional new clubs in the course of my Toastmasters career, and to contribute beyond my individual home club.   I plan to become Area Governor, and eventually get involved at the Division, District level and beyond!

I celebrate the two things that the Toastmasters International organization has given me:   the gift of being able to communicate and being able to lead.  It’s the best professional development club for the price, and I will never get tired of promoting it to others!

 

Global Risk Report 2014–Risks and Trends to Watch


1.  Introduction

As mentioned in an earlier post, the list of global risks that were used as the basis for the survey of respondents has undergone changes in the past few versions of the Global Risk Report conducted by the World Economic Forum.

At first, 25 risks were used, but this was expanded to 50 risks in 2012 and 2013.   In 2014, this list was pared down to 31 global risks in five categories:  economic, societal, geopolitical, environmental, and technological.

However, when the respondents were given the list of 31 global risks, they were asked to contribute risks which they felt needed to be paid attention to but which had not been included on the list.   These are risks which need to be watched because they are gaining in probability due to recent trends.   In previous editions of the report, these were called “X factors”, which I always liked because it reminded me of the old TV show of similar name.   But they’ve dropped that title in the 2014 edition and have just labeled them “Risks and Trends to Watch.”

Forgetting about what you call them for a moment, the important thing is to give these “runner-ups” a brief look.   I recognize some of these risks from recent science fiction novels I have read that explore the impact of these potential risks.   That would be worth a post in itself to list the science fiction novels that go with each risk.   But for now, I will just present the risk.

2.  Risks and Trends to Watch

Category Risks to Watch
Economic Volatility in asset prices

Rising government debt

Rise of Bitcoin and other virtual currencies

Societal Burden of an aging population

Unmanaged migrations flows

Decline of trust in institutions

Persistent gender inequalities

Ideological polarization (religious, political)

Civil wars

Youth unemployment and lack of access to education

Obesity epidemic

Environmental Plastic waste pollution

Endocrine disruptors in the environment

Environmental impact of fracking

Technological Data mismanagement

Loss of privacy/Increase in surveillance

Toxicity of nanomaterials

Impact of 3-D printing

Widespread use of drones

Accidents involving synthetic biology

A couple things to note.   First of all, the list of economic risks are all related to the idea that interest rates may rise as a consequence of the fiscal crises many governments have been undergoing.

Also, the one category of risks that were not included were geopolitical risks, so the respondents thought at least that category was well-represented by the existing 31 global risks listed in the Global Risk Report 2014.

Now that we have covered all of the 31 global risks, analyzed them both qualitatively and quantitatively, and created a “watch list” of risks that are not at the top list of risks of greatest concern, but may be in the future, it is time to turn our attention in the next post to a real important question:  How do we craft risk responses to these global risks?

Integral Life Practice–Chapter 5: The Mind Module


The purpose of the Mind Module is to introduce you to practices which expand your capability to take different perspectives, and to provide a mental framework to organize them.

Let’s start with the mental framework of Integral Theory, which is summarized in the shortened acronym AQAL, which stands for:

  • all quadrants
  • all levels
  • all lines
  • all states
  • all types

Let’s go through each of these five elements of AQAL.

1.  All Quadrants

There are two simple distinctions you can make when dividing experiences up into different types of phenomena:

Interiors (thoughts, feelings, meanings, meditative experiences) vs.

Exteriors (atoms, brains, bodies, and behaviors)

AND

Individuals (each with its own distinct form and experience) vs.

Collectives (which interact together to form groups and/or systems)

When you combine these two distinctions, you end up with four dimensions which are summarized in the four quadrants below:

Interior-Individual

“I” Space

Intentions

Exterior-Individual

“WE” Space

Behaviors

Interior-Collective

“IT” Space

Cultures

Exterior-Collective

“ITS” Space

Social Structures

Let’s take an example of how you can look at any problem from any or all of these four perspectives.   Suppose you want to discuss the problem of obesity in America, to come up with a solution.  You could point to the problem that people need to have greater will power when it comes to eating snacks, etc., that cause their obesity.   That would be a problem of “intentions”, something from the Upper Left quadrant.

Now someone could say that the problem is with behaviors that contribute to obesity, such as eating after 9 PM.   That would be a problem from the Upper Right quadrant.

A third person could say that the problem is with our culture that promotes obesity by emphasizing quantity over quality when it comes to portions at restaurants.   That would be a problem from the Lower Left quadrant.

Finally, a fourth person could say the problem is with our government that subsidizes companies that produce junk foods.   This is a problem with our social structures, and is a problem from the Lower Right quadrant.

ALL of these are problems, of course, and recognizing that they each stem from a different perspective is an important mental capacity to have if you are going to attempt to solve a multi-faceted problem like this.

2.  All Levels or All Stages

For any line of development, there are various levels or stages that represent the “altitude of consciousness”, if you will, along that line.

Let’s take an example of moral development.   The four stages are

 

Developmental  Stage

Focus of Concern
1. Pre-conventional Egocentric Self
2. Conventional Ethnocentric Clan, tribe, or nation
3. Post-conventional Worldcentric All people
4. Global Kosmocentric All sentient beings

One starts out as an infant in the pre-conventional or egocentric stage caring about only oneself and one’s immediate needs.   Later on, the infant begins to care about others in his or her own family, and then larger and larger groups in the conventional or ethnocentric stage.   In this conventional moral stage, compassion is reserved only for those in one’s own ethnic group, and enmity is reserved for those outside of one’s group.   The post-conventional or worldcentric stage has one eventually including all human beings in the circle of one’s concern, and the final stage includes all sentient beings, i.e., all life on the planet.   Here are some principles behind evolution from one stage to the next:

  • It takes time to go from one stage or level to the next.
  • It takes effort to go from one stage or level to the next; progress is not automatic, and some do not evolve beyond a certain level and remain stuck at that level.
  • Stages or levels are attained in order; no stage or level is skipped.

In communicating to people, you need to determine what stage or level they are at in order to tailor your communication to be effective.   If I am trying to convince you of the necessity to take measures against global warming, I will get nowhere by trying to evoke your sympathy for the increasing lack of biodiversity (due to various species dying off) if you are at the conventional stage of morality.   I will get nowhere by trying to evoke your sympathy for the suffering to be borne by generations to come if you are at the egocentric stage of morality.

3.  All Lines

Each human being goes through several lines of development.   There is the obvious physical development as one goes from being an infant to an adult.  But there is cognitive development, moral development, emotional development, etc.   One of the more popular comedy shows on television is The Big Bang Theory.   In this comedy, a genius-level physicist named Sheldon is extremely highly developed cognitively, but he remains emotionally and morally on the level of a child.   He and his physicist roommate Leonard interact with their neighbor Penny, who is cognitively on an average level, but who is very savvy when it comes to emotional and interpersonal development.   This mismatch between lines of development is what forms the basis for a lot of the comedy on the show.

4.  All States

States are temporary, changing levels of consciousness.   Sometimes people can receive “heightened” states of awareness that may shock them out of their complacency, but any permanent change in consciousness requires one to go through the slow, steady development mentioned in the paragraph above on “All Levels or All Stages”.   This is why when people go on retreats for weekends to seminars or workshops on spiritual topics, then can sometimes experience temporary states of heightened awareness, but can also be disappointed afterwards when they return to their normal lives and that state disappears.   They have left that state of consciousness, and are back at the same stage of consciousness they were in before the weekend retreat started.

However, these heightened states can motivate and inspire people to put in the effort and work required to go to the next stage or level in their development, so they are beneficial from that standpoint.

5.  All Types

Within each line of development, there are horizontal differences, that is, differences within each line, that divide people into different types.   The most common type experienced by all people is the difference between men and women.   Another more complicated typology that divides people into 16 groups is the Myers-Briggs typology, a combination of 4 dimensions.

The 4 Dimensions of

Myers-Briggs

Extraversion (E)

(I) Introversion

Sensing (S)

(N) Intuition

Thinking (T)

(F) Feeling

Judging (J)

(P) Perception

Understanding your own typology in Myers-Briggs (mine is INTJ, for example), and those on your team, is important for becoming an effective leader.

6.  CONCLUSION

Knowing these five elements of Integral Theory is important because it is essentially a map of consciousness which can be used to understand how to communicate to others who are in different places than you are on that map.